About project

ACWA Power signed an implementation agreement with the Ministry of Energy (MoE) in Azerbaijan for developing, building and operating a 240 MW wind power project. The wind project is expected to operate 20 years on a Build Own Operate (BOO) basis according to the Power Purchase Agreement (PPA). The 240 MW wind project will be split and built on two (2) locations as follows:

·       Khizi 3: Capacity up to 180 MW and will be generated using maximum of 45 Wind Turbine Generators (WTG), located in Khizi region;

·       Area 1: Capacity up to 60 MW and will be generated using maximum of 15 WTG, located at Absheron region.